Running Projects


* Construction of a 4 lane connector from Delhi Meerut Expressway (Km 50.000 of Package IV) to km 8.520 of NH-235 in the state of Uttar Pradesh.


* Construction Up-gradation to 2-Lane with Paved Shoulder from Km 80.675 to Km 95.550 of length 14.875 Km including Link Road from Km 0.000 to Km 1.871 of Length (1.871) Total Length = 16.746 Km on Khellani Kishtwar Chatroo - Khanabal Section of NH-244 in the Union Territory of Jammu and Kashmir on EPC Mode (Pack-IV).


* Design and construction of Road as part of ICBR works from Survansamba to Kanakspur from Chainage KM 0.000 to KM 6.550 (Net Length KM 6.550) through EPC mode of execution to include formation works, permanent works, minor bridges and surfacing work in Area of responsibility of project Vartak in the state of Arunachal Pradesh.


* Construction of Energy Dissipating Arrangement (EDA) and appurtenants works at downstream of Joshiyara Barage spillway of Maneri Bhali Stage-II, HEP at Joshiyara in Distt. Uttarkashi (Uttarakhand) under DRIP, Phase-II.


* Improvement & Upgradation of Existing Two Lane Bypass to Six Laning from Km. 403.100 (Design Ch. 402.600) to Km. 433.000 (Design Ch. 433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in the State of Karnataka to be executed on EPC Mode (Project)


* Up-gradation of Highway starting from junction with NH-44 ar Panipat connnecting Kairana, Muzzafarnagar, Miranpur, Bijnor, and terminating at its junction with NH-74 at Kotwali to Two/four lane with paved shoulder configuration- Bijnor to Kotwali, Pkg-IV of NH-709 AD

quick contact